Delivery Scheduling and Transportation Scheduling

Delivery Scheduling and Transportation Scheduling:
Shipping activities and Transportation can be scheduled automatically in sales documents. There are two different type of scheduling: Delivery Scheduling and Transportation Scheduling.
Configuration:
- Define Scheduling by Sales document Type
SaTy DlvSchl TrasSchl Backwardschl
OR X Select Select
Options for Delivery Scheduling: Space – Shipping scheduling Off
A – Shipping scheduling delivery order (w/o loading time)on
X – Shipping Scheduling on

Select the order type and specify whether you want to carry out delivery scheduling and transportation scheduling. You can also specify that for a particular Order type only Backward scheduling is carryout. (generally if required qty is not available on requested date, system carryout Forward scheduling).

When you specify Delivery scheduling, the system automatically determine Pick/Pack time and Loading time for each schedule line, according to the shipping point for which an item is shipped. The system uses Pick/Pack time and loading time to help determine the material availability date and the loading date respectively.

For each shipping point, system can – Propose default for the pick/pack time and loading time or Determine more precise time by taking other factor into account. (route, loading group, weight group).

When you specify Transportation scheduling, the system proposes Transportation lead time and Transit time for each schedule line. These times are determined by route. The system uses the transportation lead time and transit time to help determine the transportation planning date and the goods issue respectively.
Time how determined Helps to Determine
Pick/Pack time Shipping Point Mat. Availability Date
Loading Time Shipping Point Loading date
Trans. Lead time Route Trans. Planning date
Transit Time Route Goods Issue date.

- Define Scheduling By Shipping Point
For each shipping point provide following details:
Factory Calendar:
Working times:
Determine Load Time: Space – No Loading time determination.
A – Route Dependent
B – Route Dependent (Route ‘ ‘)
C – Default from shipping point
Det. Pick/Pack time: Space – No pick/pack time determination.
A – Route Dependent
B – Route Dependent (Route ‘ ‘)
C – Default from shipping point
Rounding Working Days: As buffer time.

- Maintain duration: here we can maintain all the above time for shipping point and Route.
First we have to make setting in shipping point how the Load time and pick/pack time will be determined. Suppose we select C (Default from shipping point) than it will ask to enter the time also in the same screen. If you select other option than C (means based on route) we can maintain the pick/pack time over here.
Double click on “Pick/Pack time” and provide details as below;
Shipping Point ---Route---WgtGRp---Pick/pack days----PP hours
CYSP 000002 0001 1 15

Double click on “Loading Time” and provide following details:
Shipping Point---route----Load GRP----Load time Days ----L.time hours
CYSP 000002 0001 1 10

Double Click on “Route” and fill below details for the specific route:
Transit duration days Transit dur. Hrs TransLedTimeDays TransLedTimeHrs

Credit Management/Risk Management

Credit Management/Risk Management:

Credit Management/Risk Management Setting:
Before doing setting for credit management, we need to make some setting in different function Like output determination ,partner determination, Pricing, Reports, authorization, subsequent function in shipping and availability check & TOR, Logistic control update, Updating credit control area etc) as below:

Configuration:
- Enter Setting
o Conditions : Procedures – in pricing procedure for Total, enter A in subtotal column. With this the system calculates subtotal for the credit price during pricing and store them in certain field (KOMP-CMPRE = credit price of the item).
o Configuration : Partner (Screen of Partner determination). We have two standard partner function KB (credit representative) KM (Credit Manager) for credit processing. Both partner function are allocate to partner type PE. Enter these partner function in Sales Document Header and Delivery Header. Standard setting already available.
o Output Types: Standard output condition type KRML (Credit Processing) is there.
o Requirement for creating delivery due index from order Standard – 104. (VOFM)
o Requirement for Goods issue from Delivery. Standard – 113 (VOFM)
o Apart from the above setting we have to make setting in other area as
Authorization : Two authorization objects are created for Credit Management
V_VBUK_FRE and V_KNKK_FRE
Logistic controlling Update: Info structure S066 is used for monthly updates for outstanding orders in credit management. We can change the monthly to daily or weekly.
Updating credit control Area: 11, 12, 18. The system determines higher credit update if a transaction cannot be processed with required credit update. For example update 18 is carried out if 12 is not possible.
- Determine Active Receivable per Item category.
Item category – CheckBox
Here you specify whether an item of the respective item category is to be included in credit functions. (check and update of open credit values)
- Maintain authorization
o Define document value class
Ex. HIG – High value LOW – Low value
Using document value class Credit representative can be given authorization.
o Assign document Value class. Ex.
Credit control area credit value Curcy Docu Value class
1000 10000 INR LOW
1000 20000 INR HIG
o Maintain authorization. (User setting). Authorization objects:
V_VBUK_FRE and V_KNKK_FRE

Credit Management
Configuration:
- Define Credit Group. Standard –
01 – Credit group for Sales Order
02 – Credit group for Delivery
03 – Credit group for goods issue
- Assign Sales document and delivery document
o Credit Limit check for order type
SalDtype check credit Credit Group
OR D (Automatic) 01 – Credit group for sales order
o Credit limit check for delivery
DlvType DlvCreditGrp GIcreditGrp
LF 02 03
- Define Automatic Credit Control. Based on
CreditControlArea + Risk Category + Credit Group
RCSO 0001 01
Based on these three criteria we can have different setting for credit management. Risk category is assigned to customer while creating Credit record for the particular customer. Credit Group is assigned to Order/Delivery type, credit control area is assigned to sales area and company code.
Below is the explanation of major field in setting:
No credit check: Here you can define subroutine which contains requirement to carry out credit management. If the requirement is not matched, it will not do credit check. For ex. No credit check if the document contains no item.
Item check: If you select this, the system will carryout credit check as soon as you enter the item and press enter. Generally credit check is done while you save the document.
Deviation in %: A sales order of Rs. 1000 value has been approved by credit and than customer call for another qty of value rs. 100. Here if you have defined 10%, than it will allow to enter the additional qty within the range of the deviation.
Number of days: Specify the number of days after which a changed document must be rechecked. It is used to check document already released by credit, but subsequently changed.

Credit Limit Season factor: for a particular season we want to increase or decrease the credit. Here we enter % of deviation and start date and end date. We select checkbox MINUS than it will decrease the credit limit, if we do not check the checkbox than it will increase the credit limit.

Check in financial accounting: Credit check is done for Sold-to party. It can have different Payer. Generally system checks the open item of all the payers. However if we want to restrict it to the Payer of current document, select the check box Payer.

Checks:
Reaction: Space : No Message
A – Warning
B – Error Message
C – Like A + Value by which the credit limit has been exceeded.
D – Like B + Value by which the credit limit has been exceeded.
Static check: Open Sales Order + Open Delivery document + Open billing Document + Open items
Dynamic check : The customer’s credit check split in Static Part – Open items, Open billing, open delivery items – and dynamic part, the open order. The value is calculated based on the shipping date and the credit horizon you specify in the adjacent field. For example you want the system to ignore all the open order that are due for delivery after the horizon date.

We can select either static or dynamic credit check.

Document Value: the system carry out credit check based on a maximum document value.
Critical field: it checks whether critical fields have been changed. Like Payment Terms, additional value days, fixed Value date.
Open Item: Based on open items.

- Simple credit Limit check
SalTy check Credit Credit Group
OR A
Option for credit check:
Space – No credit Limit check
A – Run simple credit limit check and warning message
B – Run simple credit limit check and error message
C – Run simple credit limit check and delivery block.
D – Credit Management – automatic credit control

In simple credit management no need to give credit group. We can assign any of the above option except D i.e. for automatic credit check. Simple credit limit check is for Sales document only.

Master Record for Credit Management:
FD32
Overview Tab: in this tab total overview of the customer is displayed like credit limits, payments details arrears etc.
Address : Address details
Central Data:
Total Amount: Credit limit for all credit control area.
Individual Limit: Credit limit within a credit control area. For any credit control area. Should not more than Total Amount
Status:
Credit Limit: Upper limit for total receivable. This amount is considered in credit check. This amount should not be grated than Individual limit.
Payment History:
In customer master record, in company code data, Payment tab if we select Payment History checkbox, than all the payment made by this customer will be shown here.

Some transaction code in credit Management:

VKM1 – blocked Sales order VA14L – SD document blocked for delivery
VKM2 – Released FD10N – display balances
VKM4 – All FD11 - Analysis
VKM3 – Sales document FBL5N – Open item display
VKM5 – Delivery F.31 – credit overview
V.01 – Incomplete Sales document F.33 – Brief Overview
F.32 – Missing data FCV1 – Create A/R summary

Sunday, February 7, 2010

Taxes

Configuration:
- Define Tax Determination rule
Tax country Seq Tax category
IN 1 MWST
IN 2 UTXJ

- Define Tax Relevancy of Master Record (Customer and Material master)
Tax Category Tax classification Description
MWST 0 Tax Exempt
MWST 1 Half Tax
UTXJ 1 Full Tax
UTXJ 2 No tax

For both Customer master and Material master we have to create above types of tax classification. In customer master, we assign this tax classification in Sales area data, billing tab page, while in Material Master we assign this tax classification in Sales: General data 1. We use this class tax classification for creating master record for the particular tax category(tax condition) for Ex.VK11 For MWST
Country CusTaxClassi MatTaxClass TaxCode
IN 1 0 A6 (12%)
IN 1 1 A3(16%)

Tax Codes are defined in FI.

- Define Regional code (For USA Only)
o Define county code
o Define City Code
- Assign Delivering Plant for Tax Determination
Assign country, geographical region, county code and city code to a Plant.
Based on the country key the SAP system determines which tax type is valid for the plant.

- Check Material Master for obsolete Tax Classification
- Maintain Sales Tax identification number determination. Here you define how VAT registration numbers are defined in the sales order and billing document. We have following options:
Space – Based on priority. Payer, than Ship to party than Sold to Party
A – Tax number copies from Sold to party
B – Tax number copies from Payer

Account Assignment

Revenue Account Determination:
Configuration:
- Check Master data relevant for Account Assignment
For Material and Customer – Define account assignment Groups and assign it to customer master and Material Master.
- Define access Seq. Standard KOFI and KOFK
KOFI – 1. Cust Ac Grp + Mat Ac Grp + Acc Key
2. Cust Ac Grp + Ac Key
3. Mat ac Grp + ac Key
4. Acc Key
5. General (Sales Organization)
- Define Condition Type KOFI and KOFK
- Define account Determination Procedure (Based on condition technique)
- Assign account Determination Procedure to billing Type
B1 – KOFI00
- Define and assign Account Keys to condition types in Pricing Procedures.
- Assign GL account – standard based on
Appl + Condi. Type + chart of acc + Sales Org + Cust Ac Grp + Mat Ac Grp + Acc Key àGL Ac
Ex: V + KOFI + INT + RCSO + 01 + 01 + ERL à 3455

What is Acc Key?
Account helps the system to determine the GL account to post the revenue. We have predefined Acc Keys as below:
ERL – Sales Revenue
ERS – Sales Deduction
ERF – Freight Revenue
EVV – Cash clearing
ERB – Rebate Sales Deduction
ERU – Rebate accruals
MWS – Tax on Sales/Purchase
EXD – Excise

Revenue Recognition:
Configuration:
- Set Revenue Recognition for Item categories.
Select Item category and go to Details: we have to fill three field as below:
Revenue Recognition: Space – Revenue recognition at time of Invoice creation, A – According to the accrual period, B – based on business transaction like good receipt for delivery relavant item or posting of sales order for item not relevant for delivery, D – accordance with the accrual period of the item.
Acc Period Start date : the accrual start date determines the start date of the period in which the revenue should be recognized. It can be proposed based on contract start date, based billing plan start date,
Revenue Distribution type: controls the distribution of revenue among the posting periods in the revenue lines in the time related revenue recognition. Space – revenue distributed evenly across all period and correction value entered in first open posting period. A – as above but correction value also entered evenly among all posting period, B – distributed to posting period according to the invoice plan and correction value to first open posting period, C – as B but correction value distributed evenly to all posting periods.

- Maintain account Determination.
o Assign GL account for revenue and differed revenue. (Like normal Ac determination)
o Assign account for unbilled receivables
Appli + Chart of Ac + Reconciliation Ac à account for non billed receivables.

Reconciliation Account Determination:
(Uses condition Techniques)
Configuration:
- Maintain Access Seq. Standard KOAB Table 8(Sales org+DC) Table 4(General)
- Maintain condition type KOAB
- Maintain Procedure KOFIAB
- Assign Procedure to billing document
Billing document type à KOFIAB
- Assign GL Ac(Based on above access seq.)
Appli + condty + chart of ac + SO + DC à GL account

Cash Account Determination:
For Cash Sales. In normal sales customer account is debited but here as it is cash sales, cash account will be debited. Uses condition techniques.
Configuration:
- Maintain access Sequence CASH Tables: 9(SO+DC+DIV) 4 (General)
- Maintain Condition Type CASH
- Maintain ac Determination Procedure KOFIAC
- Assign Ac Determination Procedure
Billing doc Type à KOFIAC
- Assign GL account
Appli + contype + Chart of ac + SO + DC + DIV à GL A/c
Here Application will be VC – Cash settlement
VC + CASH + INT + RCSO + CR + CD à3344(Cash Ac)

Business Area Account Assignment:
Configuration:
- Define rules by Sales Area. Assign any of below three to sales area
0001 – Based on Plant and division(T134G)
0002 – Based on Sales area (TVTA)
0003 – Based on SO + DS + Item DIV
- Assign business Area to Plant and Division.
If you select 0001 in above than provide following details
Plant + division à Business Area
- Assign business area by Sales Area
If you select 0002 above, than provide following details
SO + DS + DIV à Business Area

Assign Cost Center:
Allocate cost center to specific business transaction or order reason like
Sales Area + Order Reason à Cost center

Assign dunning area
Assign dunning area to individual sales area. This dunning area is than transferred to billing document. Dunning area allows you to use different dunning procedure within company code. All dunning letters issued separately for each dunning area.
Dunning area either entered manually in the document items or determined from assignment of dunning area to sales area which we define here.

SO + DS + DIV à Dunning Area

Cross-Selling

Run the SDCRSL01 program to analyze sales order to determine which products are mostly purchased together by customers. The system will searches all the sales order, list all the article purchased and how often certain pairs of article appear in same sales order. Ex. 10% of the time, customer purchased specific shirt and tie combination.

Cross Selling is achieved through condition techniques or you can use Function module also.

Configuration:
- Maintain condition type and Procedures
Table 11(Field MATNR) Condi type - C001 Cross Selling Procedure– C00001
- Maintain customer/document procedure for cross selling
A – Product Proposal
B – cross Selling
Assign document procedure to document type
- Define cross selling profile.
Provide name(ZAAAA) and provide following details:
Product proposal procedure : B00001
Cross Selling Pricing procedure: C00001
Pricing procedure : RVAA01
Cross selling dialog box : Space – dialog box will appear in sales order A – only on request
Cross selling ATP indicator – controls whether the system should run ATP check for the cross selling material.
- Assign cross Selling Profile
Sales area + Cust. PP (B) + Document PP (B) à Cross selling profile(ZAAAA).

Also we need to assign Cust PP Procedure (i.e. B) in customer master record Sales Area Data – Sales Tab – PP Procedure - assign - B

Now create Master Record for Cross Selling based on the condition techniques.

Dynamic Product Proposal

Product proposal is list of product for particular customer which are displayed during sales order creation. Suppose a particular customer orders certain material with specific quantity, than we can prepare one list which will be automatically proposed when we create sales order for that customer. We can copy material and qty or material only.

Configuration:
- Define customer Procedure for Product proposal
A - Product proposal B - Cross selling
- Define Document Procedure for Product proposal
A - Product proposal B - Cross selling
- Assign document procedure for product proposal to sales document type
OR – A Product proposal/ B Cross selling
- Maintain the table of origin for the product proposal.
o Order history
o Listed Materials
o Excluded Materials
o Item Proposal
o Customer Material info record
o Customer specific data source
For the product proposal you can combine the material from different data source. You can than determine the sequence in which they appear.
You can access the data source either online, in background or using combination of both.
- Define the procedure for the product proposal and specify the access sequence.
A00001 – PP Background
A00002 – PP Online
B00001 – Cross Selling

We provide different Function module in access sequence.
- Maintain Procedure determination (in background) for product proposal.
Sales area + PP cust Proc (A) àA00001
- Maintain Procedure determination (online) for product proposal.
Sales area + sales Off. + Sales Grp. + PP cust. Pro(A) + PP doc Proc(A) àA00002

Free Goods

FREE GOODS
Configuration:
- Uses Condition techniques (for scenario – 1)
Define condition types
Define Pricing Procedure – standard NA0001
Activate free goods determination – Sales area + Doc. Pricing proc. + Cust. Pricing proc. = NA0001
- Determine Item category for free Goods. i.e. Ord. type + ITGr + Usg + HLevIt(TAN) = TANN
- Control Free goods Pricing (for Scenario 2)
o Control Pricing for Free goods Item category – here you define whether an item cat. Is relevant for pricing or not. Like TANN
Space – No pricing (for scenario 1)
X – Pricing standard
A– Pricing for empties
B – Pricing with 100% (for scenario 2)
You also decide whether the value of item should be considered to calculate for the total value of header (Space – system will copy item to header total, X – no cumulation).
o Maintain Condition type for 100% discount – in standard system R100 is for 100% discount. No need to define other condition type.
o Maintain Pricing procedure for pricing – add the R100 in you pricing procedure(RVAA001) with requirement 55 and condition base value 28 so no need to create condition record for the condition type R100.
- Set transfer of cost to main item – copy control from delivery to billing.(for scenario 3)
- Pricing for inclusive free goods without item generation. (For Scenario 4)
In free goods master if we have selected free goods category 3 (inclusive free goods without item generation), the system will not generate items for free goods. Here we use standard condition type NRAB, with condition basis formula 29 and pricing requirement 059. Category of this condition is F, it will ensure that condition is redetermined every time the qty is changed.

Master Record for Free Goods:
Based on access sequence you can define criteria for free goods. Here it can be inclusive free goods, Exclusive free goods and Inclusive free goods without item generation. Also we can control the delivery of free goods like 1. Delivery takes place regardless of main item A – Delivery only if main item is partial delivered B – delivery only if main item is fully delivered etc)

Inclusive free goods means suppose for 10 qty you want to give 2 qty as free than system will price 8 qty and 2 qty as free.
Exclusive free goods means suppose for 10 qty you want to give 2 qty as free than system will price 10 qty and other 2 qty as free.
In both the above cases, system will generate sub items for free goods with item category TANN. We have four possibilities also as below.
Inclusive free goods without Item generation means for 10 qty.


Hence we can have four different situations:
1. Normal free goods
a. Create condition techniques
b. Create master record with A inclusive B Exclusive
c. TANN not relevant for pricing(space – not relevant for pricing)
Here if you select the TANN line and go for pricing analysis in sales order, the price will be zero.
2. Free goods with Pricing control
a. TANN relevant for pricing with 100% (B – Pricing for free goods (with 100% disc.))
b. Condition type R100 with 100% discount. Sales deduction shown as 100% discount.
Here if you select the TANN line and go for pricing analysis, the item will be priced but there will be 100% discount (R100) also.
3. Free goods with Pricing control but transfer of cost to main item.
a. TANN not relevant for pricing
b. Set transfer of cost to main item
4. Pricing for inclusive Free goods without item generation.
a. For inclusive only.
b. Free goods category 3 in free goods master records.
c. Condition NRAB.
d. TANN not relevant for pricing.
Here system will not create sub item but will deduct the discount condition (NRAB)

Saturday, January 30, 2010

BF-Availability check

Availability Check:
It determines if the desired delivery quantity can be met on requested delivery date.
ATP : it is the stock quantity which are not reserved and can be delivered to customer.
ATP = present stock + planned inward – planned outward.

Types of Availability check:
- Check against ATP quantity
- Check against Product allocation
- Check against planning


Different dates:
Order date : Date of order
Material available date: date on which material available for picking and packing
Transportation planning date: date from which transportation planning started
Loading date: date on which material is loaded in vehicle.
Goods issue date: date on which material is dispatched from the plant.
Delivery date: date on which customer receives the Goods at his premises.

Different Time:
Transit time – from goods issue to delivery date
Loading time – Loading date to goods issue date
Lead time for transportation planning – trans. Planning date to loading date
Pick/Pack time - from material available to loading date



During availability check system calculates all this time and dates into consideration.
First we assume that we are doing availability check without RLT.
Case – 1 confirmation on required delivery date. Here the main date is material availability date. How it is calculated? System first takes into account the requested delivery date than it searches for transit time and based on it, system determined goods issue date. From goods issue date it deducts loading time and accordingly it determines Loading date. After that it searches for Pick/Pack time and deduct it from the Loading date and it determine the Material availability Date.
Now the system will calculate whether the required quantity will be available or not. This it calculates from today’s stock + planned inward – planned outward.

Case – 2 Confirmation at a later date.
In the above first case system carried backward scheduling, but suppose the material is not available on the mentioned material availability date, then the system carryout Forward scheduling. Here system will first determine on which date the material will be available and accordingly it will determines other dates.

Case –3 Partial delivery
If it is allowed in customer master, than system will carryout partial deliveries based on material availability.

Availability Check with RLT:
RLT – Replenishment Lead time. It is the time required to produce or procure the material. Now suppose if we do availability check with RLT, than even material is not available on the availability date but the availability date is after the RLT, than the system will confirm the quantity. It will assume that we can produce or procure the materials per the RLT.

For delivery, delivery item category can be used to control whether an availability check takes place in delivery.
Configuration:
In MM
- Define MRP controllers and assign it in Material master
- Defines Floats(Schedule margin key) and assign it in material master.
In SD-BF for availability check with ATP logic
- Define checking Group
-
- Define material block for other user. You can block other user to use this material while you are doing availability check. This is defined for checking group.
- Define checking group default value. Mat type + Plant = checking group FERT + C000 = 01
- Carryout control for availability check.
Define controls for checking group(availability check) + checking Rule(Predefined)
Like 01 Daily Req. + A SD Order or B SD Delivery.
Based on this combination you will define which stocks you will consider, which inward/outward movement you will consider and RLT time will be considered or not for determining material availability date.
- Define Procedure for Requirement class. Activate TOR and Avail. Check at Req. class level.
- Define procedure for each schedule line. Activate TOR and Avail. Check at sch. Line level.
- Determine procedure for each delivery item. Activate avail. Check for deli. item
- Checking rule for updating backorders. Plant + checking rule C000 + A
- Define default setting. Here you define for each sales area whether the system should pop up a window whenever there is a shortfall of material. The window will show the dates on which the material will be available. It will give option like Accept the Proposal, Onetime delivery, complete delivery.

BF-Transfer of Requirement

Transfer of Requirement:
Transfer of required quantity and dates of a sales document to materials planning department.

Types of TOR :
TOR with individual requirement – Requirement based on each schedule line in sales order is transferred.
TOR with collective requirement – combine several requirement based on daily or weekly.
Collective requirement can be transferred according to following criteria:
- Plant, Batch, Storage Location, Date, Transaction, Requirement class.

The system creates individual requirement for special stocks even if collective requirement is specified.

Controlling element of TOR and Availability check:
Requirement class: the transfer of requirement must be switched on at requirement class level.
Requirement Type: the requirement type must exist which should determine requirement class.
Plant: A Plant must be defined at item level in sales order.
Checking Group: A checking group must be defined in the material master record. (Ex. 01 coll. Req. 02 Ind. Req.)
Schedule line Category: the TOR must be switched on at schedule line level.

Stock Requirement Display – MD04
It displays requirement of orders, schedule line its.
Availability Overview: CO09

Configuration:
- Define Requirement Class
- Define Requirement Type – just assign Req. type to Req. class.
- Determination of requirement types using transaction – how the req. type is determined in the document. “Item category + MRP type = Req. Type”
- Define procedure for each schedule line. Activate TOR and avail check for Schl. Line.(check box)
- Block quantity confirmation in delivery blocks – in delivery blocks we can blocks delivery creation for a different blocking reason. Means we can sale the sales order but can not create delivery unless we remove the delivery block. However it does not block the TOR and qty confirmation, but in certain block like due to Credit problem, we need to block the TOR and qty confirmation also so that quantity should not be confirmed for the sales order. That we define here for every reason whether we want to block the TOR also i.e. qty confirmation. In addition to that you can define the Days up to which you want to block the qty confirmation. Suppose it takes 10 days for you to clear the matter of customer credit problem, that you can put 10 days as difference period and after 10 days it will automatically transfer the requirement and will confirm the qty.

Standard req. class:
011 – Delivery Req.
030 – Sales from stock
031 – Order requirement
039 – Service Item
040 – Make to order
041 – order/deli. Req.

How the Requirement type is determined in Documents:
1. First, an attempt is made to find a requirements type using the strategy group in the material master.
2. If the strategy group has not been maintained, the system will determine it using the MRP group.
3. If the MRP group has not been defined, the system uses the material type instead of the MRP group when accessing the corresponding control tables.
4. If no requirements type is found here, the system assumes a special rule and attempts to find a requirements type with the aid of the item category and the MRP type.
5. If this is not possible, a last attempt is made to find a requirements type with the item category only.
6. If the last attempt fails, the system declares the transaction as not relevant for the availability check or transfer of requirements

Based on Requirement Type, system defines Requirement class.

BF-Incompletion Log

Incompletion Log:
- Define Incompleteness Procedure
- Assign incompleteness Procedure
- Define status group
Incompleteness Objects – Incompleteness group:
- Sales – Header
- Sales – Item
- Sales – Schedule line
- Partner
- Sales activity
- Delivery Header
- Delivery Item
Incompleteness Procedure :
First we have Incompleteness Group like Sales – Header, under that we have Incompleteness Procedure like 10 – Inquiry , 11 – Order etc. in each procedure, we have fields which should be filled during the creation of the particular document. We can set the system, whether we want to give Error or Warning message. However in delivery no warning message can be given, we have to define error message only.
If we set warning message, we can save the document but cannot process further. If we set for error message, than we cannot save the document unless and until we provide the incomplete fields.

BF-Partner Determination

Partner Determination for customer Master (Acc grp), Sales Document Header (sales document type), Sales Document Item (Item type), Delivery (delivery type), shipment (shipment type), billing Header (billing document type), billing Item (billing document type), Sales Activity (Sales activity type).

Partner Determination:
Partner Type : KU – Customer, LI – Vendor, AP – contact person, PE – Personnel
Partner function : SP – sold to party, FA – forwarding agents, CP – contact person, SE – Sales employee
Mandatory Partner Function : Sold-to Party, ship-to Party, Bill-to Party, Payer

Customization:
Define Partner Function: we can use standard defined partner function available in SAP like Sold-to party, ship-to party etc. however we can define our own partner functions also. For new :
Partner Func – Name – Partner Type – error – sup. Part. Func. – Uniqueness – cust. Hier. Type
SP sold-to KU 07 Select
Define Partner function Procedure and assign allowed partner function to it. We have standard partner procedures available like:
- AG – sold-to Party (for customer master)
- TA – standard Order (Sales Header)
- N – standard Item
- LF – Delivery note
- TR – shipment header gen.
- FK – billing Document
- FP – Billing Item
Assignment –
Part. Procedure – Parnter Function – Not modifiable – Mandatory function
AG SP Select Select
AG BP Select

Partner Determination Procedure assignment:
We assign the procedure to acc grp(for customer master), Order type (For sales header), Sales Item category(for Sales Item), Delivery type (For delivery), Billing type (for billing header & item).

Account group – Partner function assignment:
Assign allowed partner function for each customer account group.

Friday, January 29, 2010

Special Master Data

Special Master data : for Sales tools.
- Customer Material info record
- Item Proposal
- Listing & Exclusion
- Product substitution

Customer Material Information Record – VD51
- Defines customer alias for material and description.
- Can further define attributes of material, shipping and partial delivery information specific to customer and material.

Item / Product Proposal VA51
PV – Item proposal
MS – Product proposal
It is defined in order type.

- Used to define frequently ordered combination or special assortment of products and quantities.
- Either products or products with quantity can be selected during order entry.
- An item proposal is assigned in customer master data.
Master record for Item Proposal:
VA51 - Provide sales area and Provide Item proposal type PV Item proposal, MV – Product proposal, Provide validity period, enter materials with Qty. Save.
Note down the Number and assign the same in customer master record in Sales area data – Sales tab – Item proposal. In sales order we have to select the button “Propose Item”.

Material Listing & Exclusion: VB01
Used to what products are available for a customer or group.
It is customized by condition Techniques.
Customer Listing: customer receives only specific materials. If the sold-to-party is different than the payer in the sales order and if both partners have master records, the system first search for the sold to party’s master record. If it finds valid master record, it stops searching. Any records listed for payer are not taken into consideration. If the first search is not successful, the system searches for the payer’s master records.
Material Exclusion: Ensures that customer does not receive certain materials. If the sold to party is different than the payer in the sales order and both partner have master records, the system searches first for the sold-to party’s records. If the system finds a valid record, the reference to the material is prevented and system stop searching. It does not check the payer’s master record. If the first search is unsuccessful, the system searches for the payer’s master record.

Product substitution / Material Determination / Product Selection.
It is based on condition techniques.
Configuration:
- Maintain prerequisite for Material determination. Maintain access seq. condition type, procedure. Standard is A00001 – A001
- Assign Procedure to Sales document type OR – A00001
- Define substitute reason. Here you define following things:
o Substitute reason and its description
o Entry checkbox – it indicates whether the system prints the name of the original material in the output.
o Warning checkbox – it indicates whether the system display a warning message before substituting the material.
o Strategy: it controls whether the material should be substituted automatically or the selection list should be displayed.
Space – Automatic, A – substitute products are displayed for selection (Manual)
o Outcome – control whether the outcome of product selection should replace the original entry or it should be recorded as sub item of the original entry.
Space – Item will be replaced.
A – Substitution products are displayed as sub items.
B – As in A but only when creating item in sales.
If you select A than in delivery again substitution will be carry out and if at that time substitute products are not available than main item or other substitute products will be delivered.
If you select B than the substitute product selected in sales order will be copied into the delivery.
Standard item categories ate TAX (Main item) and TAPS (sub item). Here pricing and availability check will be carried out at sub item. However if you want to carry out pricing at main item, than make necessary changes in main item i.e make it relevant for pricing and for sub item make it for Not relevant for pricing.
Schedule line categories are CX and PP respectively.


Enables automatic or manual substitution of materials during sales order processing.
You can assign substitute reason to every master record in material determination that defines how the material should be determined. You define substitute rules in customizing.
You do not need a material master record for the material you are entering.
The Item Overview of Sales A contains information about the material that was originally entered as well as the reason for substitution.
Reason 0005 – Manual Product Selection (List of default values)
Reason 0004 / 0006 – Automatic product selection (Depending on availability in order and delivery)
In Manual Selection – it displays a list of all substitute materials and other information in master records. To simplify selection, the system displays the material quantity that can be confirmed on requested delivery date. If not than it displays the possible date the material will be available.

In automatic product selection, the system replaces the entered material automatically if it is not available. In automatic selection, based on customizing, the system may display the entered and substitute material as main item and sub-items in sales order.

When you enter the material in sales order it replaces with the first material in the selection master record. But suppose required quantity is 10 and the first materials has 4 qty available, than it will select the second material in the master record and fills the remaining qty with the second material.

We can choose whether we want to re-run the material determination in delivery or not.

You can use the product attributes in material and customer master records to exclude a particular material from product selection. This means for example that all the materials that have been rejected in the customer master will not be included by the system when it determines the substitution material.

The sequence of substitute materials in master data influences the result of the automatic product selection in the order.
If you want the material originally entered in the sales order to be included in the substitution, than you must enter it in the substitution list. Here now we can have two scenarios:
- If the original material is at the first place in the list and its available stock is included in the substitution. Than the system refers to the available stock of the next material in the master record.
- If the material originally entered in the sales order, is not in the first place of the substitution list, the system uses up the available stock of the materials that appears in the master records before the material that originally entered.

Wednesday, January 27, 2010

Master Data

Master Data:
Master data is pool of data which are created centrally in the system and available for every document whenever they want to access the data.

Data origin in Sales documents:
- Customer Master
- Material Master
- Customer-material info record
- Conditions Records (Pricing, Output, Cross Sales, Free Goods, Material determination,

Customer Master:
General Data: Relevant for SD and accounting. Tabs:
- Address
o Title, Name, Search term, Street, City, Pincode, country, Region, timezone, transportation zone, Language,
- Control data
o Vendor, VAT reg no
- Payment Transaction
o Bank details
- Marketing
o Nielson ID, Customer class, Industry, annual sales, no of employee, Legal status, fiscal year variant,
- Unloading Points
o Unloading point, Receiving point, Calendar, Customer calendar, goods receiving hours
- Export data
- Contact Persons
o Name, home address, visiting hours, Partner function
Sales Area data:
- Orders
o Sales district, Sales office, Sales grp, customer grp, Order probability, Item proposal, currency,
o Price grp, customer Pricing procedure, Price list, Customer statistic grp,
- Shipping
o Delivery priority, Order combination, Shipping condition, Delivering plant, Completer delivery req, max partial delivery, Tolerance,
- Billing document
o Rebate, Price determination, Invoicing dates, Invoicing list dates, Inco terms, Terms of Payment, Credit control area, Acc assignment group,
o Country, Tax category, tax classification
- Documents
- Partner functions.

Company Code Data:
- Account Management
o Reconciliation account, Cash management grp,
- Payment Transaction
o Terms of Payment, Payment History record
- Correspondence – dunning prcedure
- Insurance

Effects of changes in Customer Master data:
When you change the master data after having used it for creating document, its changes do not affect the document created. However Address is an exception. Means new address will be reflected in the old documents also.

Account groups in customer Master:
It determines which fields are to be used in defining customer master. Depending upon the partner function and transaction, we assign or change the field status(Optional, Mandatory, Display, Suppressed) . Depending upon the field status system prevents the particular field in the customer master while maintaining customer master.

Mandatory Business Partners:
Sold-to-Party
Bill-to-Party
Ship-to-Party
Payer

Organization unit in customer Master:
- Company Code
- Sales Organization
- Distribution channel
- Division

Material Master:
It is grouped in several views. Like
- General data 1 and 2
o UOM, Gross Weight, Net weight, division, Gen Item cat grp, Weigh unit
o xPlant material status
- Classification
- Sales – Sales org - 1
o Basic UOM, division, Material group, Sales unit, Delivering plant, sales discount
o Country, tax category, Tax classification(liable or except)
o Mini Order qty, Min Deli qty, Delivery unit, Dist channel specific status
- Sales – Sales org - 2
o Material Statistic grp, Material Pricing grp, Volume Rebate grp, acc assignment grp, Item category Grp
- Sales : General/Plant Data
o Base unit, Gross Weight, Net weight, Avail. Check, Batch management,
o Transportation grp, Loading grp.
- Foreign trade/Export
- Purchasing
- MRP 1 – 2 - 3 – 4
o MRP grp, MRP Type, MRP controller, Lot size
o Procurement type, In-house production time, Planned delivery days, SchMargin Key
o Strategy grp, Availability check, Total RLT time
- Accounting 1 -2
o Valuation category, Valuation class, Price control, Price unit, Moving price, Standard price,
- Costing

Organization unit in Material Master:
- Plant
- Storage Location
- Sales Organization
- Distribution channel
-

Cross-division sales:
Here header division can differ with division of other material entered in sales order. We can control this in customization of sales document :
- Check division – Whether it is possible to enter multiple material with different division(different then the header division). We can set it in document type whether it should show error message, dialog or no dialog.
- Item division - whether the division in material master is copied in the document or the division in header also copied in to the item level. If we select this checkbox, then division from material master will be proposed in the item.

Division specific sales: If you set the Check Division for Error message, then it becomes division specific sales, and we can n not enter material from different division and which differs from the header division.

Condition Master:

Pricing condition:
For Pricing component – Price, Discount & Surcharge, Freight and Tax.
The condition type defines multiple use of condition.
You can have a percentage, a quantity dependent or an amount dependent surcharge or discount.
By specifying validity period, you can restrict a price agreement to a certain period.
We can maintain values within a condition record according to a scale.

Shared Master data Concept:
We define common DS and DIV to share master data of common DS and DIV with other DS and DIV.

On the sales org/Distribution channel level we can define which distribution channel should be used to accessing the condition records and which should be used for customer and material master.

On the Sales org/Division level, we can define which division should be used to accessing the condition record and which should be used for customer master.(not material master)

It is not possible to define shared master data for sales organization.

Shared Master data and SIS:
Even if you are using shared master data, the data values transferred to SIS comes from values in sales documents.
For multi-division sales you must specify the correct source field for the division in SIS so that this setting affects the updating rules in the SIS. i.e. MCVBAK-SPART or MCVBAP-SPART.

SD In Brief

SD in Brief:
- Enterprise Structure
- Master data
- Sales
- Shipping
- Billing
- Sales info system
- Transportation
- Sales support
- Foreign Trade

Enterprise structure:
IDES means: Internet Demonstration and Evaluation System.

SD Organization units:
- Company code
- Sales area
o Sales Organization
o Distribution channel
o Division
- Plant
- Storage Location
- Shipping Point
- Sales Office
- Sales Group
- Sales Personals
Sales Line: Sales organization – distribution channel – Plant

Definitions:
Company Code: a complete independent accounting unit, represented as smallest organizational unit in external accounting.
Sales Organization: it is unit in logistic which groups the enterprise according to the requirement of sales and distribution. It has its own master data for customer, material and conditions and did not share it master data with other sales organization. it is responsible for distribution goods and services, for negotiating sales, carry out each business transaction.
Distribution channel: it is a means through which material or service reaches to customers. We can create master data for customer, material or conditions.
Division: it represents a product line. We can have master data for customer and conditions. ( not for material master).
Sales area: it defines the distribution channel, a sales organization uses to sell products from a certain division.

Plant: the plant is location where materials are kept. In R/3, plant can represent a production facility or simply grouping of locations (Storage location) in physical proximity.

Shipping Point: Highest organizational unit in Shipping that controls all shipping activity. A shipping point can be a loading ramp, a mail depot, or a rail depot. It can also be a group of employees responsible only for urgent deliveries. A shipping point is physical place and should be near to delivering plant. One shipping point can belongs to several plant and one plant can have several shipping point.
It is decided in sales order based on Plant, shipping condition and loading group.

Saturday, January 16, 2010

SAP ERP

About SAP & ERP
ERP makes management reporting and decision making fast and easy.
Managing 4 M’s of the organization.
- Man
- Money
- Machine
- Material
MRP developed in 1970, which involved planning of materials according to the production schedule.
Package Evolution:
SAP, Oracle, Siebel, People Soft, JD Edwards, BAAN,

Benefits:
Improve business performance
Support business growth requirement – new product, new market,
Provide integrated real time system
Eliminate limitations in legacy system.
All data are available in central database.
Eliminate data redundancy.
Data is updated and available real time.

SAP
Systems Applications and Products in data processing.
Founded in 1972 by 5 former IBM employee. Head office at Walldorf, Germany.
It is table driven customizing software.
Version:
SAP R/1 - 1972
SAP R/2 - 1979
SAP R/3 - 1992
SAP R/3 4.6B
SAP R/3 4.6C
SAP R/3 4.7C
SAP R/3 4.7EE (Enterprise Edition)
ECC 5.0 (mySAP ERP 2004s)
ECC 6.0 (mySAP ERP 2005s)
ECC – ERP central component)

mySAP Business Suit Contains:
mySAP ERP
mySAP CRM
mySAP PLM
mySAP SRM
mySAP SCM

All the above packages are developed on SAP NetWeaver.

Benefits of SAP
- Multilingual
- Multi currency
- Multi company

R/3 Architecture:
Presentation Layer -àSAP GUI
Application server -àR/3 server component
Database Layer à Actual database

All this can be on same machine or can be on different machines. If different then TCP/IP software joins the layer together.

SAP system Landscape:
Three different environment:
- Development client
- Quality client
- Production client
For each client, we will have Presentation Layer, Application Layer, Database Layer.

Networking is handled by combination of VSAT and Leased Lines or VPN.
Data transfer from one client to other client is done through Transport Request.

Projects in SAP:
Three teams:
- Implementation team.
- Client Core team
- Client Power users.

ASAP Methodology:
- Project Preparation
- Business blueprint
- Realization
- Final Preparation.
- Go-Live and support

Types of Projects:
- Implementation (Big bang)
- Roll Outs (Phase wise)
- Production support and maintenance.